Diario de Obras · Mon 16 Nov
Site report · Sant Josep de sa Talaia, Ibiza

Can Leela

Monday, 16 November 20264 workers34 hSunny · 20°C
Dressing marès stone for the north terrace wallIllustrative
In brief
  • Stone recovered from the old terraces sorted.
  • West drainage set out with the architect.
Site report

The day was spent sorting the stone recovered from the old terraces by size and colour, so it can be reused in the new north wall while preserving the original character of the finca.

In the afternoon the west façade drainage route was set out with Laia Ribas, shifted half a metre to protect the olive tree's roots.

Gallery

Images are illustrative placeholders, not real project evidence.

Work completed
  • Stone sorted
Upcoming activities
  • Tue 17 Nov · West trench excavation
Crew
  • Rubén CostaStonemason
  • Iván TorresStonemason
  • Abdel BenaliLabourer
  • Marius PopescuBricklayer

Based only on confirmed site facts. Consolidated from 4 individual worker submissions. In production, AI drafts this text from confirmed facts; the supervisor reviews it before publishing.