Visual prototype · Demonstration data only · No live connections or authentication
Construcciones EduEdition · 16 Nov 2026
Diario de Obras
Monday, 16 November 2026

Preparing the week on both sites

2
Active sites
8
Workers involved
2
Photos & videos
In brief
  • Can Leela: recovered stone sorted for reuse.
  • Gina: scaffold raised to first floor.
Published read-only snapshot · v1
01 · Sant Josep de sa Talaia

Can Leela

4 workers
34 h
Dressing marès stone for the north terrace wallIllustrative
Achievements
  • Stone recovered from the old terraces sorted.
  • West drainage set out with the architect.

The day was spent sorting the stone recovered from the old terraces by size and colour, so it can be reused in the new north wall while preserving the original character of the finca.

Upcoming activities
  • Tue 17 Nov · West trench excavation
Read the full site report
02 · Santa Eulària des Riu

Gina

4 workers
34 h
Gina, floor slabs and pool structureIllustrative
Achievements
  • South façade scaffold raised to the new level.
  • Temporary power supply extended.

The south façade scaffold was raised to first-floor level and perimeter edge protection was extended before formwork began.

Upcoming activities
  • Tue 17 Nov · Pool watertightness test
Read the full site report

In production, each edition is drafted by AI from individual worker submissions, reviewed by the supervisor and published as a read-only snapshot. This edition is written demonstration content.

Images are illustrative placeholders, not real project evidence.