Construcciones EduEdition · 18 Nov 2026
Diario de Obras
Wednesday, 18 November 2026

Can Leela's stone wall advances as materials arrive at Gina

2
Active sites
9
Workers involved
10
Photos & videos
In brief
  • Can Leela: 14 m of stone wall and 22 m of drainage completed.
  • Gina: materials received and first-floor formwork at 60%.
  • Rain forecast Thursday: protect trenches and formwork.
Published read-only snapshot · v1
01 · Sant Josep de sa Talaia

Can Leela

5 workers
42.5 h
Dressing marès stone for the north terrace wallIllustrative
Perimeter drainage trench with slotted pipe on gravel bedIllustrative
Electrical conduits in the main bedroomIllustrative
Walk-through of the finished stone wall (sample video)
0:48
Illustrative
Can Leela, south façade with scaffolding on the east wingIllustrative
Achievements
  • North terrace stone wall: 14 linear metres raised to final height.
  • Perimeter drainage: 22 m of slotted pipe laid along the west façade.
  • Main bedroom electrical conduits completed.
  • Marès stone delivery confirmed for Friday.

Work on the north terrace continued with the dry-stone retaining wall that will support the new olive terrace. Rubén Costa and Iván Torres dressed and set the local marès stone along the central section, raising fourteen linear metres to the final height of 1.20 m agreed with the architect. Each stone is selected and dressed on site so that its face matches the existing walls of the finca, which is why the wall advances section by section rather than in one continuous run.

Outstanding tasks
  • Final 9 m of the north wall
  • Connect drainage to the soakaway
  • Bedroom conduit inspection
Upcoming activities
  • Fri 20 Nov · Delivery of 6 pallets of marès stone
  • Mon 23 Nov · Lime plaster starts in the main bedroom
  • Tue 24 Nov · Site visit by architect Laia Ribas
Read the full site report
02 · Santa Eulària des Riu

Gina

4 workers
34 h
Unloading stone paving and cement by crane truckIllustrative
Setting out services on the first floorIllustrative
Site overview from the access road (sample video)
0:32
Illustrative
Upper terrace cleaned and materials covered at end of dayIllustrative
Gina, floor slabs and pool structureIllustrative
Achievements
  • 6 pallets of stone paving and 40 bags of cement received and stored.
  • First-floor water and drainage set-out completed.
  • Formwork to the north edge of the first-floor slab 60% complete.
  • Upper terrace cleaned and materials protected.

The day began with a material delivery coordinated by Toni Planells. Six pallets of stone paving and forty bags of cement were unloaded by crane truck and stored on the lower platform, away from the pool area, so that they would not obstruct the formwork on the upper level.

Outstanding tasks
  • Remaining north-edge formwork
  • Fit sleeves at slab penetrations
  • Confirm rebar order
Upcoming activities
  • Thu 19 Nov · Steel rebar delivery
  • Mon 23 Nov · Structural engineer inspection
  • Wed 25 Nov · First-floor slab pour (provisional)
Read the full site report

In production, each edition is drafted by AI from individual worker submissions, reviewed by the supervisor and published as a read-only snapshot. This edition is written demonstration content.

Images are illustrative placeholders, not real project evidence.