Monday, 16 November 2026PublishedVersion 1Reviewed by Javier Marí
Workers
4Hours
34Weather
Sunny · 20°CExecutive summary
- South façade scaffold raised to the new level.
- Temporary power supply extended.
Detailed report
The south façade scaffold was raised to first-floor level and perimeter edge protection was extended before formwork began.
Sergio Tur extended the temporary power supply with a new site distribution board on the first floor.
Work completed
- South scaffold raised
Upcoming activities
- Tue 17 Nov · Pool watertightness test
Gallery
Images are illustrative placeholders, not real project evidence.
Consolidated from 4 individual worker submissions. In production, AI drafts this text from confirmed facts; the supervisor reviews it before publishing.