Gina, floor slabs and pool structureIllustrative
FES-25-004 · Santa Eulària des Riu, Ibiza

Gina

Gina — Vivienda unifamiliar de obra nueva

Construction of a 340 m² two-storey home, infinity pool, terraces and external landscaping.

In progress
38%
Current phase
Structure and first-floor services
Client
Famille Laurent
Supervisor
Javier Marí
Project manager
Daniel Ferrer
Architect
Laia Ribas
Start
18 May 2026
Planned completion
30 September 2027

Daily reports3

Wednesday, 18 November 2026PublishedVersion 1Reviewed by Javier Marí
Workers
4
Hours
34
Weather
Windy · 18°C
Executive summary
  • 6 pallets of stone paving and 40 bags of cement received and stored.
  • First-floor water and drainage set-out completed.
  • Formwork to the north edge of the first-floor slab 60% complete.
  • Upper terrace cleaned and materials protected.
Alerts & actions
  • Rebar delivery awaiting supplier confirmation.
  • Wind forecast: secure formwork panels.
Detailed report

The day began with a material delivery coordinated by Toni Planells. Six pallets of stone paving and forty bags of cement were unloaded by crane truck and stored on the lower platform, away from the pool area, so that they would not obstruct the formwork on the upper level.

On the first floor, Sergio Tur set out the water supply and drainage routes for the two bathrooms and the laundry, marking the slab penetrations that must be left before the concrete is poured. Andrei Ionescu and Luuk de Vries continued the formwork along the north edge of the first-floor slab, completing roughly sixty per cent of the run.

At the end of the day Youssef Amrani cleaned the upper terrace, removed offcuts and covered timber and stacked materials with tarpaulins ahead of the forecast wind. No incidents were recorded.

Work completed
  • Material received and stored
  • First-floor services set-out
  • 60% of north-edge formwork
  • Upper terrace cleaned
Outstanding tasks
  • Remaining north-edge formwork
  • Fit sleeves at slab penetrations
  • Confirm rebar order
Upcoming activities
  • Thu 19 Nov · Steel rebar delivery
  • Mon 23 Nov · Structural engineer inspection
  • Wed 25 Nov · First-floor slab pour (provisional)
Gallery

Images are illustrative placeholders, not real project evidence.